Roads and Highways
Veterans Parkway (IL 4) & Monroe Street/Old Jacksonville Rd – IDOT District 6
CEC provided plans, specifications, and estimates for the resurfacing of a 1.7-mile section of an existing four-lane divided state highway on the west side of Springfield in Sangamon County. The project included the complete reconstruction of the Monroe Street/Old Jacksonville Rd intersection. Work involved pavement widening, new dual turn lanes for IL 4, new turn lanes along Monroe & Rickard Rd & storm sewer reconstruction.
Sangamon Valley Trail – Sangamon County
CEC provided plans, specifications, and estimates for a future multi-use path and bicycle trail along an existing railroad corridor on the west side of Springfield. Work included Phase I studies and reports, pavement design, railroad bridge inspections and rehabilitation, timber bridge deck design, landscaping, and park connectors in coordination with the Springfield Park District and the Illinois Department of Natural Resources.
Veterans Parkway (IL 4) – IDOT District 6
CEC provided plans, specifications, and estimates for the resurfacing of a 5.1-mile section of an existing four-lane divided state highway on the west side of Springfield in Sangamon County. The project included the complete reconstruction of the Southwest Plaza Drive intersection.
County Highway 10, 800th Ave, & 600th Street – Logan County
CEC provided plans, specifications, and estimates for the recycling, resurfacing, and shoulder improvements along an existing county highway. CEC also provided structural engineering services for culvert extensions or replacements completed prior to the resurfacing project under a separate project.
County Highway 1 – Christian County
CEC provided plans, specifications, and estimates for the recycling, resurfacing, and shoulder widening improvements along an existing county highway. CEC also provided structural engineering services for a concrete box culvert extension.
Pleasant Plains Road (CH10) - Sangamon County
CEC provided plans, specifications, and estimates for the resurfacing, shoulder widening, and intersection improvements along an existing county highway. CEC also provided structural engineering services for a concrete box culvert extension.
Waverly Road (CH10) - Sangamon County
CEC provided plans, specifications, and estimates for the resurfacing, shoulder widening, and intersection improvements along an existing county highway. Work also included a hydraulic study, culvert extensions, and replacement culverts, which were completed prior to the resurfacing.
Bethany-Findlay Road (CH 13) – Moultrie County
CEC provided plans, specifications, and estimates for the realignment, reconstruction, and resurfacing along an existing county highway in Moultrie County. Work also included drainage studies, three-sided precast culvert replacements, staged construction, right-of-way, and environmental coordination.
Old Jacksonville Road (CH8) - Sangamon County
CEC provided plans, specifications, and estimates for the recycling and resurfacing of an existing county highway with additional new overlay and improved shoulders.
Roads and Highways
Veterans Parkway (IL 4) & Monroe Street/Old Jacksonville Rd – IDOT District 6
CEC provided plans, specifications, and estimates for the resurfacing of a 1.7-mile section of an existing four-lane divided state highway on the west side of Springfield in Sangamon County. The project included the complete reconstruction of the Monroe Street/Old Jacksonville Rd intersection. Work involved pavement widening, new dual turn lanes for IL 4, new turn lanes along Monroe & Rickard Rd & storm sewer reconstruction.
Sangamon Valley Trail – Sangamon County
CEC provided plans, specifications, and estimates for a future multi-use path and bicycle trail along an existing railroad corridor on the west side of Springfield. Work included Phase I studies and reports, pavement design, railroad bridge inspections and rehabilitation, timber bridge deck design, landscaping, and park connectors in coordination with the Springfield Park District and the Illinois Department of Natural Resources.
Veterans Parkway (IL 4) – IDOT District 6
CEC provided plans, specifications, and estimates for the resurfacing of a 5.1-mile section of an existing four-lane divided state highway on the west side of Springfield in Sangamon County. The project included the complete reconstruction of the Southwest Plaza Drive intersection.
County Highway 10, 800th Ave, & 600th Street – Logan County
CEC provided plans, specifications, and estimates for the recycling, resurfacing, and shoulder improvements along an existing county highway. CEC also provided structural engineering services for culvert extensions or replacements completed prior to the resurfacing project under a separate project.
County Highway 1 – Christian County
CEC provided plans, specifications, and estimates for the recycling, resurfacing, and shoulder widening improvements along an existing county highway. CEC also provided structural engineering services for a concrete box culvert extension.
Pleasant Plains Road (CH10) - Sangamon County
CEC provided plans, specifications, and estimates for the resurfacing, shoulder widening, and intersection improvements along an existing county highway. CEC also provided structural engineering services for a concrete box culvert extension.
Waverly Road (CH10) - Sangamon County
CEC provided plans, specifications, and estimates for the resurfacing, shoulder widening, and intersection improvements along an existing county highway. Work also included a hydraulic study, culvert extensions, and replacement culverts, which were completed prior to the resurfacing.
Bethany-Findlay Road (CH 13) – Moultrie County
CEC provided plans, specifications, and estimates for the realignment, reconstruction, and resurfacing along an existing county highway in Moultrie County. Work also included drainage studies, three-sided precast culvert replacements, staged construction, right-of-way, and environmental coordination.
Old Jacksonville Road (CH8) - Sangamon County
CEC provided plans, specifications, and estimates for the recycling and resurfacing of an existing county highway with additional new overlay and improved shoulders.
State Bridges
Interstate 55 over Kickapoo Creek and Kickapoo Creek Overflow – IDOT District 6
CEC provided plans, specifications, and estimates for the rehabilitation of the dual interstate highway bridges carrying northbound and southbound I-55 over Kickapoo Creek. This work included concrete repairs, bridge deck replacement, superstructure replacement, scour evaluation and countermeasures, and roadway maintenance of traffic plans utilizing crossovers.
IL Route 9 over Sugar Creek – IDOT District 5
CEC provided plans, specifications, and estimates for the rehabilitation of the bridge carrying IL 9 over Sugar Creek at Bloomington in McLean County, including PPC deck beam inspections, staged deck beam replacement, deck overlay, railing improvements, and approach roadway work.
IL Route 10 over I-72 – IDOT District 5
CEC provided plans, specifications, and estimates for the rehabilitation of the bridge carrying IL Route 10 over I-72 in Piatt County, including bridge jacking, deck replacement, and approach roadway work.
Prairieview Road over I-74 - IDOT District 5
CEC provided plans, specifications, and estimates for the rehabilitation of the bridge carrying Prairieview Road over I-74 in Champaign County, including staged bridge jacking, deck replacement, and approach roadway work.
US Route 51 over Main Drainage Ditch - IDOT District 6
CEC provided plans, specifications, and estimates for the construction of a replacement of a three-span Precast Prestressed I-Beam bridge and approach roadways in Christian County.
State Bridges
Interstate 55 over Kickapoo Creek and Kickapoo Creek Overflow – IDOT District 6
CEC provided plans, specifications, and estimates for the rehabilitation of the dual interstate highway bridges carrying northbound and southbound I-55 over Kickapoo Creek. This work included concrete repairs, bridge deck replacement, superstructure replacement, scour evaluation and countermeasures, and roadway maintenance of traffic plans utilizing crossovers.
IL Route 9 over Sugar Creek – IDOT District 5
CEC provided plans, specifications, and estimates for the rehabilitation of the bridge carrying IL 9 over Sugar Creek at Bloomington in McLean County, including PPC deck beam inspections, staged deck beam replacement, deck overlay, railing improvements, and approach roadway work.
IL Route 10 over I-72 – IDOT District 5
CEC provided plans, specifications, and estimates for the rehabilitation of the bridge carrying IL Route 10 over I-72 in Piatt County, including bridge jacking, deck replacement, and approach roadway work.
Prairieview Road over I-74 - IDOT District 5
CEC provided plans, specifications, and estimates for the rehabilitation of the bridge carrying Prairieview Road over I-74 in Champaign County, including staged bridge jacking, deck replacement, and approach roadway work.
US Route 51 over Main Drainage Ditch - IDOT District 6
CEC provided plans, specifications, and estimates for the construction of a replacement of a three-span Precast Prestressed I-Beam bridge and approach roadways in Christian County.
Railroad Crossings
Black Dog Railroad Crossing - Moultrie County
CEC provided plans, specifications, and estimates for the construction of a connector road and crossing closure to improve a grade crossing along an existing township road.
Illiopolis Railroad Crossing (CH32) - Sangamon County
CEC provided plans, specifications, and estimates for a grade crossing profile improvement and resurfacing along an existing county highway.
Railroad Crossings
Black Dog Railroad Crossing - Moultrie County
CEC provided plans, specifications, and estimates for the construction of a connector road and crossing closure to improve a grade crossing along an existing township road.
Illiopolis Railroad Crossing (CH32) - Sangamon County
CEC provided plans, specifications, and estimates for a grade crossing profile improvement and resurfacing along an existing county highway.
Local Bridges & Culverts
Wendle Rd over Tributary to Piasa Creek - Jersey County
CEC provided contract plans, specifications, and estimates for a local bridge replacement and approach roadway realignment along an existing township road. The roadway alignment was improved for safety, and an aluminum box culvert provided a clear zone culvert without requiring a guardrail along the sweeping curved roadway.
Vachel Lindsay Bridge Rehabilitation & Construction Engineering – City of Springfield
CEC provided plans, specifications, and estimates for the rehabilitation of this historic bridge over Lake Springfield. This work included shotcrete structural repairs, deck slab patching, epoxy polymer deck overlay, drain installation, stone railing repair, electrical conduit installation, and bridge pier lighting installation. CEC also provided construction engineering for the City of Springfield during the construction process. The design process involved coordination with the IHPA, the City of Springfield, and the Illinois Department of Transportation.
Vachel Lindsay Bridge Inspection & Future Rehabilitation – City of Springfield
Vachel Lindsay Bridge Inspections – City of Springfield
CEC provided structural bridge inspections of this historic concrete arch bridge over Lake Springfield. Work included bridge inspections and coordination with the IHPA, the City of Springfield, and the Illinois Department of Transportation.
Farmingdale Road over Little Spring Creek (CH 15) – Sangamon County
CEC provided plans, specifications, and estimates for a replacement single-span integral abutment steel I-beam and poured concrete deck bridge and approach widening along an existing county highway in Sangamon County.
County Line Culverts (TR1) - Sangamon County
CEC provided bid plans, specifications, and estimates for two culvert replacements and approach widening along an existing township road. Aluminum Box Culverts were selected as the structure type and were installed by the county.
Divernon Brush Creek Overflow - Sangamon County, Village of Divernon
CEC provided engineering services for the study of Brush Creek near Divernon in Sangamon County. Work included a hydraulic study report and a set of plans, specifications, and estimates for a single-span overflow bridge.
Washington Street (TR425) - Sangamon County
CEC provided plans, specifications, and estimates for a replacement three-span PPC deck beam bridge and approach widening along an existing township road near Pawnee, IL.
Black Diamond Road (CH28) - Sangamon County
CEC provided plans, specifications, and estimates for a replacement three-span PPC deck beam bridge and approach widening along an existing county highway near Pawnee, IL.
Local Bridges & Culverts
Wendle Rd over Tributary to Piasa Creek - Jersey County
CEC provided contract plans, specifications, and estimates for a local bridge replacement and approach roadway realignment along an existing township road. The roadway alignment was improved for safety, and an aluminum box culvert provided a clear zone culvert without requiring a guardrail along the sweeping curved roadway.
Vachel Lindsay Bridge Rehabilitation & Construction Engineering – City of Springfield
CEC provided plans, specifications, and estimates for the rehabilitation of this historic bridge over Lake Springfield. This work included shotcrete structural repairs, deck slab patching, epoxy polymer deck overlay, drain installation, stone railing repair, electrical conduit installation, and bridge pier lighting installation. CEC also provided construction engineering for the City of Springfield during the construction process. The design process involved coordination with the IHPA, the City of Springfield, and the Illinois Department of Transportation.
Vachel Lindsay Bridge Inspection & Future Rehabilitation – City of Springfield
Vachel Lindsay Bridge Inspections – City of Springfield
CEC provided structural bridge inspections of this historic concrete arch bridge over Lake Springfield. Work included bridge inspections and coordination with the IHPA, the City of Springfield, and the Illinois Department of Transportation.
Farmingdale Road over Little Spring Creek (CH 15) – Sangamon County
CEC provided plans, specifications, and estimates for a replacement single-span integral abutment steel I-beam and poured concrete deck bridge and approach widening along an existing county highway in Sangamon County.
County Line Culverts (TR1) - Sangamon County
CEC provided bid plans, specifications, and estimates for two culvert replacements and approach widening along an existing township road. Aluminum Box Culverts were selected as the structure type and were installed by the county.
Divernon Brush Creek Overflow - Sangamon County, Village of Divernon
CEC provided engineering services for the study of Brush Creek near Divernon in Sangamon County. Work included a hydraulic study report and a set of plans, specifications, and estimates for a single-span overflow bridge.
Washington Street (TR425) - Sangamon County
CEC provided plans, specifications, and estimates for a replacement three-span PPC deck beam bridge and approach widening along an existing township road near Pawnee, IL.
Black Diamond Road (CH28) - Sangamon County
CEC provided plans, specifications, and estimates for a replacement three-span PPC deck beam bridge and approach widening along an existing county highway near Pawnee, IL.
Structural Projects
Temporary Soil Retention System – United Contractors Midwest
CEC provided structural engineering services for a temporary soil retention system for the staged construction of a three-sided concrete culvert on IL 48 over Buckhart Creek in Christian County.
I-74 Reconstruction at Peoria – United Contractors Midwest
CEC provided various structural engineering services including temporary soil retention, temporary shoring, braced excavation, cofferdams, and MSE wall reinforcement details in Peoria and Tazewell counties.
Structural Projects
Temporary Soil Retention System – United Contractors Midwest
CEC provided structural engineering services for a temporary soil retention system for the staged construction of a three-sided concrete culvert on IL 48 over Buckhart Creek in Christian County.
I-74 Reconstruction at Peoria – United Contractors Midwest
CEC provided various structural engineering services including temporary soil retention, temporary shoring, braced excavation, cofferdams, and MSE wall reinforcement details in Peoria and Tazewell counties.
IDOT Prequalification
CEC is currently prequalified in various categories by the Illinois Department of Transportation (IDOT). For more information on IDOT prequalification, please go to the link.